Layering Blocks, Geogrid, and Backfill
At 12:28 in
This makes MORE walls FAIL than anything. #retainingwall
What happens here
Following the installation of the initial drainage system, more courses of retaining wall blocks are laid. After every few courses (typically based on manufacturer specifications or engineering design), another layer of geogrid is laid over the blocks and back into the soil. Soil is then placed behind the wall and compacted using the vibratory plate compactor. This process of laying blocks, geogrid, and compacting backfill is repeated until the desired height of the retaining wall is achieved, ensuring structural integrity and proper soil reinforcement.
Goal: Subsequent courses of retaining wall blocks are laid atop each other, with additional layers of geogrid placed at specified intervals and backfilled with soil, then compacted to create a stable, multi-layered structure.
Tools and materials
- Concrete Retaining Wall Blocks
- Geogrid
- Level (Spirit/Torpedo)
- Shovels/Rakes
- Vibratory Plate Compactor (Wacker Plate)
- Soil/Drainage Aggregate