Geogrid and Drainage System Installation
At 7:30 in
This makes MORE walls FAIL than anything. #retainingwall
What happens here
Once the first course of blocks is laid, a layer of geogrid is unrolled and stretched over the blocks and extended into the backfill area. The geogrid acts as soil reinforcement, enhancing the wall's stability. Simultaneously, a perforated drain tile is laid along the base of the wall, wrapped in filter fabric ('sock') to prevent clogging. Specific sections of drain tile are cut and connected to T-junctions that integrate with pre-cut openings in some blocks, forming channel drains to direct water away from the wall face.
Goal: After the first course, geogrid is laid for soil reinforcement, and a perforated drain tile system is installed, complete with channel drains, T-junctions, and filter fabric for effective water management.
Tools and materials
- Channel Drain (Pre-fabricated)
- Drain Tile T-Junctions
- Electrical Tape
- Geogrid
- Measuring Tape (Milwaukee)
- Utility Knife (Milwaukee FASTBACK)
- Zip Ties
- Filter Fabric (Drain Tile Sock)
What they say
(2,494 characters)Hide
What they say
(2,494 characters)Auto-generated from the video audio.