Skip to main content

Installing First Course of Retaining Wall Blocks

6:48
15:32
49K views

At 6:48 in

This makes MORE walls FAIL than anything. #retainingwall

What happens here

Workers meticulously lay the first course of concrete retaining wall blocks directly onto the compacted gravel base. Each block is checked for levelness and alignment, often using a rubber mallet to make minor adjustments. This initial course is critical as it dictates the stability and appearance of the entire retaining wall. Blocks may need to be cut with a concrete saw to fit curves or ends.

Goal: The first layer of concrete retaining wall blocks is carefully placed on the compacted gravel base, ensuring they are level and properly aligned to set the foundation for the entire wall.

Tools and materials

  • Concrete Retaining Wall Blocks
  • Concrete Saw (Cut-Off Saw)
  • Level (Spirit/Torpedo)
  • Measuring Tape
  • Rubber Mallet