Remove All Remaining Nails
At 15:20 in
This is the hardest thing I have ever done...(EP.7)
What happens here
After all old shingles and damaged sheathing have been removed and replaced, the entire roof deck must be cleared of old fasteners. Use a roofing hammer or a specialized nail-pulling tool (like the roofing rake with teeth shown) to either pull out all remaining nails or hammer them flush with the sheathing surface. This is a critical step to prevent punctures in the new underlayment and shingles, as well as to ensure a flat, safe surface for subsequent roofing layers. This step is highlighted as tedious but necessary.
Goal: Methodically go over the entire stripped roof surface to locate and remove or hammer down any old roofing nails to ensure a smooth, safe surface for new underlayment.
Tools and materials
- Nail-Pulling Tool (Roofing Rake)
- Roofing Hammer
What they say
(1,012 characters)Hide
What they say
(1,012 characters)Auto-generated from the video audio.