Skip to main content

I want it to be BIG!!!

1:01
31.2K views

Video by Mr. Build It

Mr. Build It

What happens here

This video details the initial construction phases for installing concrete footings, which is a common prerequisite for various outdoor structures or extensions. The process shown includes accurately measuring the designated area, removing existing pavers, precisely cutting cardboard concrete form tubes, digging deep holes using both powered and manual digging tools, and finally, positioning these form tubes to create the molds for concrete pouring. This is a foundational step in preparing for a stable and frost-resistant base.

Transcript

Hide

I want it to be big and I want it to stay Within These pavers so it'll look more fitted we're looking at roughly around 12 ft by 20 ft that should be big enough for sure so we need to do is take out some of these pavers and start digging out our footings very important with the footings we need to go below our frost line which is going to be quite a bit of digging to find out where our concrete forms will [Music] go all right so these concrete forms are going to go just like that say hello to my little [Applause] [Music] friend this is too easy and too [Music] fun we'll be done in no [Music] time perfect only three more to go

Auto-generated from the video audio.