Site Assessment and Initial Excavation

0:00
15:26
15.3K views

At 0:00 in

This guy Ripped off his CREW

What happens here

The crew begins the day by assessing the previously excavated trench line along a commercial building. They note the presence of an old concrete footing and existing sidewalk sections that need to be removed or adjusted. The primary goal is to establish a stable and correctly leveled base for the new retaining wall. One worker is seen using a shovel, while another operates a mini-excavator to remove debris and loose soil. The discussion highlights the complexity of working around existing structures and varying ground levels.

Goal: The construction crew performs an initial assessment of the work area, which involves an existing trench and concrete footing. They discuss the challenges of the terrain, specifically the need to remove sections of old sidewalk and concrete walls.

Tools and materials

  • Mini-excavator (Daewoo 75V)
  • Safety Vest
  • Shovel

What they say

Hide

dug out whatnot okay [Music] Johnny every everyone's wondering where Sam went to here's a Sam here's a [Music] Sam what do you do tearing this out would be a nightmare you got lose the sidewalk build it up so corrected yeah