Final Excavation and Base Preparation

5:42
15:26
15.3K views

At 5:42 in

This guy Ripped off his CREW

What happens here

Tools and materials

  • Leveling Rod
  • Mini Excavator (Kubota SVL 75)
  • Plate Compactor
  • Safety Glasses
  • Safety Vest
  • Shovel
  • Gravel (Rock)

What they say

Hide

we deal with some valid change orders all right so we finished getting everything dug out and whatnot okay Johnny right Sammy every everyone's wondering where Sam went to here's a Sam here's a Sam all right we're just having fun out that work but all right back to seriousness uh we got everything excavated it they wanted us to just go right over this so we got it down to where we could it for having our having our us have a comfortable base is going over the top of this we had to get down to a certain point so there was a lot of a lot of screwing around with this now we got our grades all set and all that stuff now it's just we're ready to put Rock in and on this side and then we'll start basing this out and then go that way Timmy's over here on this side starting to dig cuz Sam's got this all based out and ran out of Base ping area so now we're just going to start digging this back out and this footing in here FY deep to get our Rock in so we just went over the top of it this over here we dug down well we're going to clean this up a little bit more but dug down to get our get our 6 in of rock depth behind the stone and then we'll probably get two to three in some of these higher spots but it it just couldn't get the top of this to come off so that's that's then this footing goes down three four blocks and it's on top of another footing so that's a a Fross footing under our wall what do you do tearing this out would be a nightmare you got lose the sidewalk Build It Up soil corrected yeah a whole nine yards but yeah that would be a they don't want to hold the whole nine yards 10 yards you would be 10 [Music] yards now when you're out on a job site you are the pro you're the one that the customer is depending on to help make the best decisions so when something unforeseen comes up what I've learned to do is to give my customer a couple different options I don't like to overwhelm them and give them six seven eight different options because it just adds into the confusion you've got to remember that the reason you were hired in the first place is because the customer is depending on you for guidance on their project but it's not your job to guide their financial decisions so when a change order comes up and it could hit their purse strings you've ultimately got to have the customer sign off that it was their decision because it's their money does that make sense [Music]

Auto-generated from the video audio.