Skip to main content

Base Preparation for Retaining Wall

1:05
15:26
15.3K views

At 1:05 in

This guy Ripped off his CREW

What happens here

A layer of 'rock' (likely gravel or crushed stone) is spread along the bottom of the excavated trench. This material serves as a drainage layer and a stable, permeable base for the retaining wall blocks. Workers use a transit level and a leveling stick to ensure the base is perfectly flat and at the correct elevation. A vibratory plate compactor (also known as a wacker plate) is used to thoroughly compact the rock layer, achieving maximum density and stability. This step is crucial for the long-term stability and levelness of the retaining wall.

Goal: After clearing, workers prepare the trench base by laying and compacting a layer of rock/gravel, ensuring it is level for the first course of retaining wall blocks.

Tools and materials

  • Leveling Stick/Grade Rod
  • Shovels/Rakes
  • Skid Steer (Kubota SVL 75)
  • Transit Level/Laser Level
  • Vibratory Plate Compactor
  • Base Rock/Gravel

What they say

Hide

here for breaking up this concrete wall CU this is all coming out now they cut down this huge tree that was here this morning and then we're coming all the way through here and then coming back against the building right here so all this is getting redone changed

Auto-generated from the video audio.