Laying the Keystone Compact Units (Second Tier)
3:30
16:09
131.7K views
At 3:30 in
The Ugliest retaining wall we've ever built -in 4k!
What happens here
The crew begins laying the second tier of the main retaining wall. This tier consists of 'Keystone compact units' in gray, which were already on site from the previous contractor. These blocks feature pins for interlocking and can be core-filled for added stability. Blocks are meticulously leveled and squared using a speed square and a bubble level, often requiring repeated tapping with a hammer to adjust their position on the challenging Class 5 base. String lines are used to maintain straightness and consistent height.
Goal: Install the second tier of the retaining wall using existing Keystone compact units.
Tools and materials
- Bubble Level — Ensuring blocks are perfectly level, both horizontally and front-to-back
- Keystone Compact Units Keystone — Constructing the second tier of the retaining wall
- Rubber Mallet — Tapping blocks into place for precise leveling and adjustment
- Speed Square — Squaring blocks against the existing wall or adjacent blocks
- String Line — Maintaining a straight line and consistent height across the wall tier
- Work Gloves — Hand protection