Installing the New Pressure Tank
15:17
23:27
177K views
At 15:17 in
the "NO SEE UM" Contractor Scam! PULLED & Released w/NEW UPDATES
What happens here
The new pressure tank is brought to the site by A&T Pump Service. The mini excavator is again used, with the chain, to carefully lower the new, wrapped pressure tank into the pit. Once positioned, the well service technician connects it to the well system's plumbing and wiring.
Goal: Install the new pressure tank into the well system.
Tools and materials
- Bobcat 325 Mini Excavator Bobcat — Lowering the new pressure tank
- Chain — Lowering the new pressure tank
- Wire Strippers — Connecting electrical wiring
- Wrenches — Connecting plumbing fittings
- New Pressure Tank — The replacement well component
What they say
(571 characters)Hide
What they say
(571 characters)Auto-generated from the video audio.