Laying Out Fence Line and Digging Post Holes
13:15
18:09
9.9K views
At 13:15 in
The General Contractor screwed US
What happens here
After clearing the site and addressing immediate issues, the primary DIY project of installing a fence begins. The first step involves carefully laying out the fence line to ensure proper alignment and spacing for the posts. This is done by marking the desired locations with small flags and a measuring tape. Once marked, a skid steer equipped with a powerful auger attachment is used to dig deep and precise holes for each fence post along the marked line. This footage is intercut with the creator's advice on the importance of genuine customer care, specifically introducing the '20-minute rule'.
Goal: Prepare the fence line and dig all necessary post holes.
Tools and materials
- Measuring Tape — Accurately marking post spacing
- Skid Steer with Auger Attachment — Efficiently digging fence post holes
- Small Flags — Marking individual post locations
What they say
(1,142 characters)Hide
What they say
(1,142 characters)Auto-generated from the video audio.