Retaining Wall Block Installation and Drainage System
At 6:00 in
The customer tries to SABOTAGE his OWN job! 4K
What happens here
Workers begin laying the first course of interlocking concrete retaining wall blocks into the leveled trench. Each block is carefully placed and leveled to ensure a uniform foundation. A specialized drainage pipe (perforated pipe with sock) is installed behind the first course of blocks to collect and redirect water, preventing hydrostatic pressure buildup. Geogrid is then placed over the blocks and extended back into the slope, and the area behind the blocks is backfilled with gravel for drainage. Subsequent courses of blocks are laid, with additional geogrid layers and gravel backfill at specified intervals for stability.
Goal: Construct the retaining wall with proper drainage and reinforcement.
Tools and materials
- Level Smart Level — Ensuring blocks are level and plumb
- Plate Compactor Tomahawk — Compacting backfill behind the wall
- Rakes Various — Spreading gravel backfill
- Rubber Mallet Various — Adjusting block placement
- Safety Glasses Various — Protecting eyes during work
- Shovels Various — Backfilling and fine-tuning soil levels
- Work Boots Various — Foot protection and traction
- Geogrid Various — Reinforcing the soil behind the retaining wall
- Gravel Backfill Various — Providing drainage and stability behind the wall
- Perforated Drainage Pipe — Collecting and draining water behind the wall