Patio Base Preparation

1:15
13:43
134.3K views

At 1:15 in

The customer tries to SABOTAGE his OWN job! 4K

What happens here

After the initial demolition, the crew works on grading the ground for the new patio. This involves using the mini excavator to remove remaining soil and debris, followed by manual raking and leveling. A plate compactor is used to compact the sub-base, and screeding bars are laid out to ensure a uniform and level surface for the paver base.

Goal: Prepare a level and compacted base for the new patio.

Tools and materials

  • Bobcat Mini Excavator — Rough grading and earth moving
  • Level Various — Checking the slope and level of the base
  • Plate Compactor Tomahawk — Compacting the soil and gravel base layers
  • Rakes Various — Fine grading and spreading base material
  • Screeding Bars Various — Guiding the screeding process to create a level sand bed
  • String Line Various — Establishing grades and alignment
  • Gravel Base Material Various — Creating a stable, permeable base layer for the patio