Skip to main content

Installing Geogrid and Subsequent Courses

1:05
13:43
134.3K views

At 1:05 in

The customer tries to SABOTAGE his OWN job! 4K

What happens here

Once the first course is complete, proceed with laying subsequent courses of retaining wall blocks. After every 1-2 courses (or as per manufacturer's specifications and wall height requirements), install geogrid. Lay the geogrid directly on top of the block course, extending it backward into the soil mass behind the wall. The geogrid should be cut to the appropriate length, rolled out smoothly, and pinned in place if necessary. After placing the geogrid, backfill the area behind the blocks with granular material (crushed stone or gravel), ensuring the geogrid is covered. Compact this backfill thoroughly in lifts (layers) of 6-8 inches using the plate compactor. Repeat this process of laying blocks, installing geogrid, backfilling, and compacting until the desired wall height is reached. This layered approach with geogrid reinforces the soil, preventing lateral movement and ensuring the long-term stability of the retaining wall.

Goal: This is a repetitive step where subsequent layers of blocks are laid, followed by the installation of geogrid for reinforcement and then backfilled with granular material, ensuring proper drainage and stability.

Tools and materials

  • Geogrid
  • Level (Spirit Level)
  • Retaining Wall Blocks
  • Rubber Mallet
  • Shovels and Rakes
  • Utility Knife
  • Vibratory Plate Compactor

What they say

Hide

question on and then just ask me in the comments below and I'll try to come back to it but the job site starts out pretty straightforward and then when we get to the backyard we've got a big retaining wall to build things get tricky and the customer takes away our

Auto-generated from the video audio.