Excavation and Sub-Base Preparation

0:45
13:43
134.3K views

At 0:45 in

The customer tries to SABOTAGE his OWN job! 4K

What happens here

After demolition, excavate the area where the new retaining wall will be constructed to the specified depth and width, ensuring enough space for the wall blocks, drainage, and geogrid. Remove all loose soil, debris, and any organic matter. Once the excavation is complete, lay down a layer of granular material (e.g., crushed stone or gravel) to form the sub-base. Spread this material evenly and compact it thoroughly using a vibratory plate compactor to achieve a dense, stable, and level foundation for the retaining wall. Ensure the sub-base is perfectly level and sloped slightly back into the hill, as this is crucial for the wall's long-term stability.

Goal: This step focuses on excavating the area to the required depth and width for the new retaining wall, followed by the preparation of a stable and level granular sub-base.

Tools and materials

  • Level
  • Mini Excavator (Bobcat 331)
  • Rakes
  • Shovels
  • String Line and Stakes
  • Vibratory Plate Compactor
  • Granular Material (Crushed Stone/Gravel)

What they say

Hide

things get tricky it starts out pretty basic we're going to first remove this patio and then rebuild the retaining wall and instead of walking you and telling you what's going to happen I'm just going to let you watch our process and if you have any questions about anything you see during today's video just Mark what time you have the question on and then just ask me in the comments below and I'll try to come back to it but the job site starts out pretty straightforward and then when we get to the backyard we've got a big retaining