Excavation and Sub-Base Preparation
At 0:45 in
The customer tries to SABOTAGE his OWN job! 4K
What happens here
After demolition, excavate the area where the new retaining wall will be constructed to the specified depth and width, ensuring enough space for the wall blocks, drainage, and geogrid. Remove all loose soil, debris, and any organic matter. Once the excavation is complete, lay down a layer of granular material (e.g., crushed stone or gravel) to form the sub-base. Spread this material evenly and compact it thoroughly using a vibratory plate compactor to achieve a dense, stable, and level foundation for the retaining wall. Ensure the sub-base is perfectly level and sloped slightly back into the hill, as this is crucial for the wall's long-term stability.
Goal: This step focuses on excavating the area to the required depth and width for the new retaining wall, followed by the preparation of a stable and level granular sub-base.
Tools and materials
- Level
- Mini Excavator (Bobcat 331)
- Rakes
- Shovels
- String Line and Stakes
- Vibratory Plate Compactor
- Granular Material (Crushed Stone/Gravel)