What happens here

Once all courses of blocks, geogrid, and the drainage system are in place, complete the final backfilling behind the retaining wall with suitable soil. Fill the area up to the desired grade, ensuring proper compaction in lifts (layers) as before. Grade the soil so that it slopes away from the top of the wall, directing surface water away and preventing erosion or excessive water pooling. Remove any remaining debris from the site and smooth out the surrounding area for a clean, finished look.

Goal: The final layers of backfill are placed and compacted, followed by grading the soil behind the wall to ensure proper surface drainage and a finished appearance.