Site Preparation and Liner Placement
0:00
17:23
8.4K views
At 0:00 in
The customer said "Build what you think is best"
What happens here
The video starts by showing the construction site, where a large pond and stream system is being built. The crew is preparing the area, with excavators and loaders on site, and various rock sizes and pond materials laid out. A large pond liner is shown being spread out, and the basic outline of the pond and stream is beginning to take shape. This initial stage involves heavy machinery for excavation and shaping the landscape, followed by manual labor to refine the contours and place the protective underlayment.
Goal: Prepare the pond site and install the underlayment and main liner for the pond and stream.
Tools and materials
- EPDM Pond Liner
- Mini Excavator
- Protective Underlayment
- Rakes
- Shovels
- Skid Steer Loader
- Work Gloves
What they say
(544 characters)Hide
What they say
(544 characters)Auto-generated from the video audio.