First Water Fill and Flow Test
At 1:35 in
The customer said "Build what you think is best"
What happens here
With the liner, underlayment, initial rock work, and plumbing in place, the pond is ready for its first fill. Water is introduced into the system, and the pump is turned on to begin circulating water through the skimmer, flexible PVC pipes, and into the waterfall box, creating the first flow in the stream. This initial fill allows for a visual inspection of water flow, identifying any areas that need adjustment, and checking for leaks in the liner or plumbing connections. The dirt and debris introduced during construction will be flushed out, and the system can be fine-tuned.
Goal: Fill the pond and test the water circulation through the installed plumbing and waterfall.
Tools and materials
- Garden Hose
- Shovels and Small Hand Tools
- Submersible Pond Pump
- Water N/A