Skip to main content

Final Review of Completed Deck

28:14
30:17
124.9K views

At 28:14 in

Start-to-Finish 3 day DIY Floating deck - BIG REVEAL!

What happens here

The finished deck is showcased, featuring a clean, flat surface of MoistureShield composite decking, a sturdy staircase, and a uniquely styled railing system. The main top rail is a 2x4 pine, supported by additional framing underneath to compensate for the composite's flexibility. Decorative barge channel ropes are strung between the posts, adding a nautical aesthetic and serving as a secondary railing. The entire project was completed in three days. The presenter expresses satisfaction with the new deck and the tools provided by SKIL for the project.

Goal: Showcase the completed deck and its features.

Tools and materials

  • Completed Deck N/A — The final result of the project

What they say

Hide

big deck three days this big deck let me say it was 11 23 34 feet by 12 34 by 12 that's just that section right yeah then this is and then this was whatever 10. that's it we still we're gonna put on a stair stringer and then we're gonna let that we're gonna let the deck adjust because we got an old deck and we've got a new deck we're gonna let these two adjust and then we're gonna probably raise up the box yeah we'll put a center beam but we're going to let everything go to where it's got to go that's what we got what nothing we have good tools yeah for the job no no uh no complaints on really i think i mean you're really picky about tools nothing like seriously nothing no no they all worked i didn't use nothing to mine dude i liked i liked them too yeah this was all right this was a surprise to me the 12 yeah 12 volt this it did yeah

Auto-generated from the video audio.