Install Stone Steps
At 13:59 in
Start to Finish Rebuild -day 1 of 2
What happens here
To integrate the patio with the existing structure, a Milwaukee MX FUEL cut-off saw is used to neatly trim the existing concrete, ensuring a clean and tight fit for the new stone step. A diamond ultra blade is installed for efficient cutting. Once the concrete is prepared, a heavy 375-pound stone step is carefully transported on a pallet by a skid steer (Caterpillar 259D) and then precisely maneuvered into its final position using lifting straps by two crew members. They adjust its alignment and levelness to create a seamless transition.
Goal: Use a cut-off saw to trim existing concrete and then use a skid steer and lifting straps to precisely place a heavy stone step into the prepared base.
Tools and materials
- Diamond Ultra Blade (12 inch)
- Level
- Lifting Straps (Orange)
- Milwaukee MX FUEL Cut-Off Saw
- Rubber Mallet
- Skid Steer (Caterpillar 259D)
- Stone Step