Constructing the Boulder Retaining Wall
At 6:29 in
Start to Finish Rebuild -day 1 of 2
What happens here
With the mini-excavator, large boulders are carefully lifted and positioned to form a robust retaining wall. Due to the limited maneuverability of the mini-excavator compared to specialized equipment like a hydro-grapple, a crew member assists by guiding the boulders into precise positions by hand. Each boulder is 'bedded down,' meaning it is settled firmly into the ground and locked in place to ensure stability and prevent any future shifting of the wall. This is a meticulous process that requires careful coordination.
Goal: Place large boulders, with assistance, to form a stable retaining wall, ensuring each boulder is securely 'bedded down' to prevent movement.
Tools and materials
- Mini-Excavator (Bobcat T325)
- Safety Gloves
- Shovel
- Large Boulders
What they say
(1,703 characters)Hide
What they say
(1,703 characters)Auto-generated from the video audio.