Prepare and Position the Blower Frame
0:40
8:10
122.7K views
At 0:40 in
Spray Booth Ventilation System? How to set up a Ventilation System for a Mobile Jobsite Paint Booth.
What happens here
To install the blower system frame, first, ensure the holding devices are slipped into the spray booth's frame before the corners are tightened. The presenter demonstrates loosening the wing nuts on the bottom of the orange blower frame piece. This frame will be inserted into the booth and positioned centrally to ensure even air drawing across the entire booth.
Goal: Securely position the blower system frame within the spray booth.
Tools and materials
- Blower Frame PaintLife Supply Co — The frame that holds the blower and filter
- Spray Booth PaintLife Supply Co — The enclosure for painting
- Wing Nuts — To secure the blower frame
What they say
(1,026 characters)Hide
What they say
(1,026 characters)Auto-generated from the video audio.