Skip to main content

Prepare and Position the Blower Frame

0:40
8:10
122.7K views

At 0:40 in

Spray Booth Ventilation System? How to set up a Ventilation System for a Mobile Jobsite Paint Booth.

What happens here

To install the blower system frame, first, ensure the holding devices are slipped into the spray booth's frame before the corners are tightened. The presenter demonstrates loosening the wing nuts on the bottom of the orange blower frame piece. This frame will be inserted into the booth and positioned centrally to ensure even air drawing across the entire booth.

Goal: Securely position the blower system frame within the spray booth.

Tools and materials

  • Blower Frame PaintLife Supply CoThe frame that holds the blower and filter
  • Spray Booth PaintLife Supply CoThe enclosure for painting
  • Wing NutsTo secure the blower frame

What they say

Hide

it has um these devices right here this is what's gonna hold this thing in place you definitely want to slip these things in before you do your corners um and tighten them down uh i didn't do it first i just loosened it and slipped it in now so you can have them in you know beforehand if the corner if that's really tight it might be a little bit hard to get them in later on if you are going to um hook up your blower system you know make sure you toss these things in before you lock your corners down now there's two holes on the bottom of it these uh wing nuts right here you're just going to remove the wing nuts and this is what's going to hold this system in place right here so i'm loosening these wing nuts right here now i'm going to set that up inside there and i want i mean you could have this thing set anywhere you know in your booth or um you can have it towards one side but i want it centered in the booth that way it's drawn evenly across the boot puts across the booth i'm going to put my wingnuts back on

Auto-generated from the video audio.