Mount Filter Assembly and Connect Ducting
3:55
8:10
122.7K views
At 3:55 in
Spray Booth Ventilation System? How to set up a Ventilation System for a Mobile Jobsite Paint Booth.
What happens here
Once the plastic is cut, attach the filter assembly (filter in its frame) to the main blower frame on the inside of the spray booth. The earth magnets on the filter frame will snap it securely into place. Then, connect the flexible orange ducting to the outside of the blower system frame. The ducting typically comes with a built-in strap; use this to cinch the ducting tightly to the frame. An adapter may be required depending on the size of your blower's intake.
Goal: Securely attach the filter assembly and ventilation ducting to the spray booth.
Tools and materials
- Adapter — To fit ducting to different blower sizes
- Ducting PaintLife Supply Co — To channel air from the booth to the blower
- Filter Assembly — To filter air exiting the booth
- Strap — To secure the ducting
What they say
(535 characters)Hide
What they say
(535 characters)Auto-generated from the video audio.