Skip to main content

Mount Filter Assembly and Connect Ducting

3:55
8:10
122.7K views

At 3:55 in

Spray Booth Ventilation System? How to set up a Ventilation System for a Mobile Jobsite Paint Booth.

What happens here

Once the plastic is cut, attach the filter assembly (filter in its frame) to the main blower frame on the inside of the spray booth. The earth magnets on the filter frame will snap it securely into place. Then, connect the flexible orange ducting to the outside of the blower system frame. The ducting typically comes with a built-in strap; use this to cinch the ducting tightly to the frame. An adapter may be required depending on the size of your blower's intake.

Goal: Securely attach the filter assembly and ventilation ducting to the spray booth.

Tools and materials

  • AdapterTo fit ducting to different blower sizes
  • Ducting PaintLife Supply CoTo channel air from the booth to the blower
  • Filter AssemblyTo filter air exiting the booth
  • StrapTo secure the ducting

What they say

Hide

are going to go down it's going to lock itself right in place extremely strong magnets now it's held in place now i'm going to hook up my vent i have an adapter right here that adapts this hole right here to drop down to attach to my blower just going to loosen this thing up i'm going to get it on there and cinch it tight has a strap to actually cinch it tight with all right so now i've worked it on there got it on i'm going to snug it down my tie strap that's going to hold it in place now i'm just going to put my blower in place

Auto-generated from the video audio.