Plumbing and Subfloor Preparation
At 3:16 in
Smallest Basement Shower Remodel
What happens here
After the fiberglass is removed, the area around the shower drain is exposed. The worker removes concrete and debris to access the plumbing for the drain and ensure it's properly positioned for the new shower pan. He inspects the existing plumbing, noting copper and PEX lines, and identifies a 2x4 stud that is overlapping the corner by half an inch, which would prevent straight walls for tiling. This stud needs to be cut off and re-secured to the inside face of the adjacent stud to allow for proper drywall and tile installation.
Goal: The shower drain area in the concrete subfloor is cleared, and the plumbing is inspected and modified. This includes clearing debris and adjusting a misplaced 2x4 stud to ensure straight walls for tiling.
Tools and materials
- Drill
- Hammer
- Saw (e.g
- reciprocating saw or circular saw)
- Trowel/Chisel
- Quikrete Quick-Setting Cement Quikrete
What they say
(1,029 characters)Hide
What they say
(1,029 characters)Auto-generated from the video audio.