Capping and Step Downs
At 29:49 in
Retaining Wall Skills: Beginner to Advanced
What happens here
This step covers the crucial final touches: capping the wall and creating step-downs. It explains the use of alternating A and B caps (different sizes) to create a staggered, seamless look with a tight seam. The "eyebrow effect" is introduced as an overhang for caps, creating visual appeal and serving as a safety feature by preventing tripping hazards. For step-downs, the video illustrates how to maintain the eyebrow effect on each step, using half units, ensuring a consistent and safe transition. The demonstration stresses the importance of extending the base for each step all the way to the back, ensuring full support and preventing individual deflection and potential failure over time. A common pitfall for step-downs is using non-flush caps, which can create a tripping hazard.
Goal: Properly cap the retaining wall for a finished look and create aesthetically pleasing step-downs.
Tools and materials
- Construction adhesive — Securing caps and layers
- Versa-Lok A caps Versa-Lok — Capping the wall (smaller size)
- Versa-Lok B caps Versa-Lok — Capping the wall (larger size)
- Versa-Lok half units Versa-Lok — Building step-downs