Removing Wall and Installing Header and Jack Studs
1:13
2:39
1.5M views
At 1:13 in
Removing load bearing walls π¬ #carpentry #learn #loadbearing #structure
What happens here
Once the temporary walls are in place and the joists are secured, the original load-bearing wall's studs and bottom plate can be removed. Then, the specified LVL or beam header is lifted into place. After the header is installed, jack or trimmer studs are added below the header to support its weight, effectively transferring the load from the joists to the new header and down through the jack studs.
Goal: Remove the load-bearing wall and install the new header with supporting jack studs.
Tools and materials
- Header β The structural beam being installed
- Jack Studs β Supporting the header
- Model House Frame N/A β Demonstrating wall removal and header installation
- Pointer Stick N/A β Highlighting parts of the model
What they say
(410 characters)Hide
What they say
(410 characters)Auto-generated from the video audio.