Removing Wall and Installing Header and Jack Studs

1:13
2:39
1.5M views

At 1:13 in

Removing load bearing walls 😬 #carpentry #learn #loadbearing #structure

What happens here

Once the temporary walls are in place and the joists are secured, the original load-bearing wall's studs and bottom plate can be removed. Then, the specified LVL or beam header is lifted into place. After the header is installed, jack or trimmer studs are added below the header to support its weight, effectively transferring the load from the joists to the new header and down through the jack studs.

Goal: Remove the load-bearing wall and install the new header with supporting jack studs.

Tools and materials

  • Header β€” The structural beam being installed
  • Jack Studs β€” Supporting the header
  • Model House Frame N/A β€” Demonstrating wall removal and header installation
  • Pointer Stick N/A β€” Highlighting parts of the model

What they say

Hide

able to remove these studs and bottom plate. Our temporary wall holds the joists. This double top plate alone will not hold your joist weight. Then you'll lift your beam or LVL. And then we install jacks or trimmers to hold the weight. Depending on your situation, more jack studs might be required. Now your temp walls get removed. The weight on your joists transfers into your LVL, goes down your jack studs,