Pre-Work Setup and Wet Area Negotiation
3:08
22:49
62.8K views
At 3:08 in
Regrading a muddy wet yard with the new skid steer
What happens here
The operator climbs into the cab of the Kubota SVL65-2, preparing for continued work. A brief discussion ensues about tackling a particularly wet and muddy depression, or 'the hole'. The strategy outlined is to engage the machine at 'full throttle' to maintain momentum and avoid getting stuck in the saturated soil, which is described as being like quicksand. The camera perspective is from inside the cab, giving a first-person view of the controls and the immediate terrain ahead.
Goal: The operator enters the cab, briefs on the plan to work in a challenging wet depression, emphasizing full throttle for traction and momentum.
Tools and materials
- Kubota SVL65-2 Compact Track Loader
What they say
(304 characters)Hide
What they say
(304 characters)Auto-generated from the video audio.