Final Rough Grading and Surface Preparation
At 12:35 in
Regrading a muddy wet yard with the new skid steer
What happens here
The operator performs the final stages of rough grading across the entire lot. This includes making multiple passes in one direction, followed by passes in a perpendicular direction, known as 'cross-hatching.' This technique effectively blends all existing contours and ensures a consistent, smooth surface. The goal is to prepare an optimal base for future landscaping, specifically for seeding. The operator emphasizes achieving an evenly blended surface where 'everything cross-hatches and completely blends together,' minimizing any unevenness from previous operations.
Goal: The operator conducts final passes for rough grading, focusing on blending contours and achieving an optimal base surface for seeding, using a methodical 'cross-hatching' technique.
Tools and materials
- 4-in-1 Bucket
- Kubota SVL65-2 Compact Track Loader
What they say
(332 characters)Hide
What they say
(332 characters)Auto-generated from the video audio.