Grading Building Pad and Addressing Drainage
At 4:25 in
Rebuilding a new Road 4K
What happens here
The operator shifts focus to the building pad and drainage areas. The ASV VT-70 is actively engaged in digging into higher sections of the terrain near the existing red-painted building and pushing soil to fill the lower areas designated for the building pad. This process serves a dual purpose: creating a level and compacted base for the future structure and establishing proper water runoff paths. The goal is to eliminate water pooling near the existing building by re-sloping the ground to divert rainwater away from the foundation and around the corner of the building, preventing potential water damage.
Goal: The compact track loader is deployed to grade a designated building pad area by filling low spots and simultaneously re-directing water drainage away from an existing building.
Tools and materials
- ASV VT-70 Compact Track Loader
What they say
(237 characters)Hide
What they say
(237 characters)Auto-generated from the video audio.