Assess Existing Site Conditions and Plan
At 0:00 in
Rebuilding a new Road 4K
What happens here
The video begins with an introduction to the property, described as 'Shangri-La Dusch,' which features a severely degraded and steep access road primarily composed of sand with no binding agents, making it unsuitable for heavy loads like a house. The presenter, Stanley, highlights the need to re-contour, shape, and widen the road to accommodate a double-wide house. He also identifies a low area designated for a future building pad that requires significant filling, leveling, and compaction. Additionally, a critical drainage issue around an existing red-painted building is noted, where hillside runoff is directed towards its foundation, necessitating re-grading to divert water. The county has mandated the road remain in its current location, despite the owner's preference for a different path, requiring substantial imported clay for stabilization.
Goal: The presenter evaluates the current state of a steep, narrow access road and identifies additional land grading needs, including a low-lying building pad area and poor drainage around an existing building. He outlines the project goals and the limitations of the existing sandy soil.
Tools and materials
- Building Site (Low Area)
- Existing Access Road
- Existing Building
What they say
(2,497 characters)Hide
What they say
(2,497 characters)Auto-generated from the video audio.