Skip to main content

Assess Site and Plan Grading Strategy

0:00
10:05
13.8K views

At 0:00 in

Rebuilding a new Road 4K

What happens here

The initial road is described as excessively steep, leading down into a ditch and then sharply upwards. The owner explains that local regulations prevent him from rerouting the road, forcing him to rebuild it in the same problematic location. He highlights that the native soil is mostly sand with no binding properties, necessitating the import of 29 loads of clay. Additionally, a specific area is identified as a future building site that is currently too low and requires significant filling. Poor water drainage around a shed is also noted as a critical issue to resolve.

Goal: The owner assesses the existing steep, narrow dirt road and identifies key challenges including poor soil composition (sand with no binder), a low-lying area needing fill for a building pad, and inadequate drainage around an existing shed.

What they say

Hide

all right guys welcome to my mass uh if you know shangra La douche you may remember that it had the worst road down to the bottom of this ditch and then straight up and in a perfect scenario I would never redo this road this way this is far from a perfect scenario in fact uh I'm being forced to redo the road in the exact same spot not by my own choice I wanted to snake it around and bring it up that way and have it curve through the woods and wow be cool and interesting the county said no and the reason the county said no cuz I had them out here is cuz there's aot little tiny bit of grass down in that ditch and that could look like Wetlands well you can actually fill in Wetlands over 400 square ft don't quote me on it but you technically can and that area is more like 12 squ ft and it's not even a wetland it's just the bottom of a freaking ditch so we're stuck going on the exact same spot now I I imported 29 loads of clay to form this road cuz my existing on-site soils is basically sand with a tiny bit of gravel mixed in and zero binder so if you know anything about roads you know that without having any binder that road won't hold its position so we've got to recontour and shape this road fix it widen it make it so that I can actually haul a house up here cuz that's one of the next things I've got going on at shanger Lage we're going to be moving a double wide up into this lot so we got a lot of work to do without wasting any more time let's start fixing on this road and get her [Music] done so so we know we got a road to build so we know we got to build the road going in but we also got two other components to this job that we got to do at the same time we've got to get a building site prepped right here cuz the building's going to go right here so this is all low so we've got to fill this area up get that leveled and compacted and at the same time we also have an issue with drainage around this side of the building you can see that the entire Hill somehow is draining into this building well not somehow it just is draining into the building and so we want clearance around the corner of the building so what we're going to do is we're going to take some of the fill from this Zone we're going to use it for the building pad and we're going to use it to fortify the sides of the road down there so we'll be here for a bit let's just get this thing rolling we're going to use do this entire job with an ASV vt70 be nice to have an excavator and a bulldozer out…

Auto-generated from the video audio.