Skip to main content

Initial Site Demolition & Clearing

0:00
26:18
29.1K views

At 0:00 in

Rebuilding a Front Yard with a total new landscape! A Simple & Cheap Design

What happens here

The project starts with the removal of existing concrete blocks and general debris from the work area. An excavator equipped with a grapple attachment is used to efficiently break up and clear these materials. Concurrently, a worker uses a walk-behind power broom to sweep dirt and smaller debris from the paved driveway, ensuring a cleaner and safer work surface as the heavy machinery operates. This initial clearing creates a blank slate for the subsequent landscape transformation.

Goal: Begin by removing any existing unwanted landscape features and clearing the immediate work area of large debris to prepare for the new design. This includes using heavy machinery for efficiency where appropriate.

Tools and materials

  • Dump Truck
  • Excavator
  • Grapple Attachment
  • Plywood/Rubber Mats
  • Walk-behind Power Broom

What they say

Hide

so here's the next portion we're gonna rip out this front yard and we're going

Auto-generated from the video audio.