Final Grading, Cleanup, and Material Removal
At 7:51 in
Rebuilding a Front Yard with a total new landscape! A Simple & Cheap Design
What happens here
After the rock garden is established, focus on the remaining landscape areas, particularly the driveway and adjacent spaces. Use a large bobcat or skid steer with a roller to compact and smooth the soil, preparing any areas for new grass or paving. The excavator is then used to load any remaining piles of soil, old concrete blocks, or general construction debris into dump trucks. A worker performs extensive manual cleanup, using shovels and a power broom to remove all remaining dirt, dust, and small rocks from paved surfaces, ensuring the site is pristine. This step also includes a final inspection to confirm all debris is removed and the site is tidy.
Goal: Perform final grading on remaining non-rock garden areas, conduct a thorough site cleanup, and remove all excess materials and debris using heavy machinery.
Tools and materials
- Bobcat / Skid Steer with Roller
- Dump Truck
- Ear Protection
- Excavator (Daewoo 75V)
- Gloves
- Rakes
- Shovels
- Walk-behind Power Broom (Makita)
What they say
(2,498 characters)Hide
What they say
(2,498 characters)Auto-generated from the video audio.