Skip to main content

Installing and Leveling the Aggregate Base

0:16
0:46
6.5K views

At 0:16 in

Patio loading πŸ˜Žβ€¦..#hardscape #hardscaper #patio #patiodesign #outdoorliving #designandbuild

What happens here

Once the sub-base is compacted, a layer of crushed stone aggregate is brought in and spread over the entire patio area. The compact utility loader is efficient for bringing in and rough-spreading large quantities of gravel. Workers then use rakes and shovels to meticulously level the aggregate to the desired thickness and grade, preparing it for compaction. The exact thickness will depend on the final patio material (e.g., pavers usually require 4-6 inches of compacted base).

Goal: Lay down and level the crushed stone aggregate base.

Tools and materials

  • Bucket Attachment β€” Attached to the compact utility loader for moving crushed stone
  • Compact Utility Loader Ditch Witch SK β€” Transporting and rough-spreading crushed stone
  • Rakes β€” Leveling and fine-tuning the aggregate layer
  • Screed Boards β€” Used with string lines to create a perfectly flat and level surface for the bedding layer
  • Shovels β€” Adjusting aggregate distribution
  • String Line and Stakes β€” Guiding the leveling process of the aggregate
  • Crushed Stone Aggregate β€” Creating the primary load-bearing base layer for the patio