Dry Overnight and Final Sanding
5:32
10:09
400K views
At 5:32 in
MODERN Concrete Finish FAST and Easy!
What happens here
After applying all three coats, let the wall dry overnight (at least 8-12 hours, but no more than 24 hours before final polishing). The manufacturer's instructions specify waiting at least two hours between coats and then no more than 24 hours for final sanding/burnishing. Once completely dry, use 600-grit circular sandpaper discs (typically used with an orbital sander but can be used by hand) to sand the entire wall in a circular motion. This sanding step helps to smooth out the surface and begin to bring out the 'highlights' of the concrete effect.
Goal: Allow the three coats to dry completely overnight, then sand the entire surface in a circular motion.
Tools and materials
- 600-grit Sandpaper