Final Grading, Sodding, & System Testing
At 7:57 in
Massive water problems led to one disaster after another. 4 k video pt 2 of 2
What happens here
After the rock and poly sheeting are installed, the entire backyard area is finalized with fresh sod. The swale is cut and blended into the existing grades, extending further up the hill than initially anticipated to create a smooth contour without sudden drop-offs or 'ankle-twisters'. Air conditioning units were also raised to prevent sinking due to water pooling from downspouts. The effectiveness of the new grading and drainage system was unexpectedly tested by two solid weeks of rain, which the speaker describes as a 'blessing'. This intense rainfall confirmed that the basements, previously prone to flooding, remained completely dry, validating the success of the project in redirecting water away from the buildings without the need for additional French drains or full foundation waterproofing.
Goal: The entire area is finalized with sod, ensuring the new swales and slopes seamlessly blend with the existing landscape, and the effectiveness of the drainage system is verified through natural rainfall.
Tools and materials
- Sod
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.