Securing and Leveling
At 7:59 in
Live edge Problems Continued...We make every mistake possible while installing our Live edge project
What happens here
After removing the old countertops, install 2x4 wood blocks along the back edge of the cabinet frames where the new countertops will rest. These blocks serve to level the naturally warped live edge wood and provide a sturdy anchor point. Use a drill to pre-drill holes and then install 5-inch lag screws through the countertop and into the 2x4s to secure the countertop firmly to the cabinet base, pulling it down to achieve a flush and level surface. This process might require multiple lag screws and adjustments to address the inherent irregularities of the live edge slabs.
Goal: Install 2x4 supports and lag screws to secure and level the countertops
Tools and materials
- 2x4 Wood Blocks — Creating a level support and anchor point along the back of the cabinet frames
- 5-inch Lag Screws — Securing the countertops to the 2x4 supports and cabinet frames
- Cordless Drill Milwaukee — Pre-drilling holes and driving lag screws
- Drill Bit — Pre-drilling pilot holes for lag screws
- Level — Checking the levelness of the installed countertops