Cylinder Head Final Assembly and Validation
18:00
50:14
206.9K views
At 18:00 in
Late Model Engines Shop Full Tour & Assembly Process! BIG POWER Chevy LSX/LT Specialists! (LME)
What happens here
After machining and hand blending, cylinder heads are thoroughly cleaned. Then, they are moved to a dedicated assembly area where various valve train components are installed. During this process, critical parameters such as spring pressures, installed heights, and distance to coil bind are meticulously checked and adjusted to precisely match the specified camshaft profile. This ensures maximum RPM capability and optimal valve train stability for high-performance applications.
Goal: Achieve optimal valve train performance and stability
Tools and materials
- Height Micrometer — Measuring valve installed heights
- Shims — Adjusting spring installed heights
- Spring Tester — Measuring valve spring pressures
- Camshaft — Specifying valve lift and timing
- Retainers — Components for the valve train
- Valve Springs — Components for the valve train
What they say
(404 characters)Hide
What they say
(404 characters)Auto-generated from the video audio.