Soil Preparation and Rock Removal
1:42
14:29
68.8K views
At 1:42 in
Last Day: Emergency Foundation repair. First Day: Franky's new site
What happens here
After initial grading, the skid steer operator focuses on removing unsuitable soil and spreading top dressing over the slope to prepare it for reseeding and vegetation establishment. The machine then approaches a pile of rocks, where another crew member assists by shoveling the rocks into the skid steer's bucket, prioritizing manual removal to avoid damaging existing grass. The loaded rocks are then transported to a wooded area for disposal.
Goal: Remove unsuitable soil, spread top dressing, and clear excess rocks.
Tools and materials
- Compact Track Loader — Moving and spreading soil, loading rocks
- Rocks N/A — Excess material to be removed
- Shovel — Manually loading rocks into the skid steer bucket
- Top Dressing Soil N/A — Preparing the slope for new vegetation
What they say
(587 characters)Hide
What they say
(587 characters)Auto-generated from the video audio.