Skip to main content

Site Grading and Initial Dirt Removal

0:29
14:29
68.8K views

At 0:29 in

Last Day: Emergency Foundation repair. First Day: Franky's new site

What happens here

The video begins with the narrator describing the start of a busy workday, highlighting the need to wrap up one project and mobilize equipment for another. The scene shifts to a job site where a yellow compact track loader (skid steer) is actively grading the terrain around a building. The operator uses the machine's bucket to push and spread soil, aiming to establish proper drainage away from the structure. Excess dirt is collected and moved to a designated area, later to be reused by the customer for filling low spots in their pasture.

Goal: Prepare the terrain around the building for proper drainage and manage excess soil.

Tools and materials

  • Compact Track Loader — Grading, moving dirt, and heavy lifting
  • Dirt/Soil N/A — Reshaping the landscape

What they say

Hide

get ready for another one we've set the grades around all the buildings to get the water to flow away now we've got extra dirt it's not bad dirt it can be reused but not for what we're trying to do with the grades so we save it for the customer to fill in any low spots in their pasture

Auto-generated from the video audio.