Skip to main content

Manual Debris Collection and Fine Leveling

0:58
14:29
68.8K views

At 0:58 in

Last Day: Emergency Foundation repair. First Day: Franky's new site

What happens here

After the primary earthmoving is completed, address any remaining piles of rock or debris that the heavy machinery could not efficiently clear. Manually shovel these smaller accumulations into the skid steer's bucket to ensure a clean and level surface. This demonstrates attention to detail in areas where heavy equipment might damage existing landscaping or where precision is required.

Goal: Manually clear any leftover rock and debris piles from the graded areas using a shovel, ensuring a thorough cleanup where machinery cannot be precise.

Tools and materials

  • Shovel
  • Skid Steer / Compact Track Loader

What they say

Hide

it's not bad dirt it can be reused but not for what we're trying to do with the grades so we save it for the customer to fill in any low spots in their pasture while Alex and Sam are working on the dirt Frankie's inside wrapping up the garage hi Frankie what what do we got left to do today there isn't much left to do but Frankie's still very picky about how it looks before he leaves meanwhile Alex continues to work outside he's gotten rid of all of the unsuitable soil and now he's just got his top dressing left to gently spread over the slope so that it can be receded and vegetation can establish there's a little extra rock left over the boys want to get that cleaned up as well they try to be careful of the grass so Alex hops to shovel as much of it into the bucket as he can get [Music] they bring it out to the woods and put it with the rest of the unsuitable soil

Auto-generated from the video audio.