Initial Site Grading and Earthmoving
At 0:28 in
Last Day: Emergency Foundation repair. First Day: Franky's new site
What happens here
Begin by assessing the completed construction or renovation area to identify any unsuitable soil or excess material that needs to be removed or re-graded. Utilize heavy machinery, specifically a compact track loader (skid steer), to scoop up and relocate piles of dirt and rock. The objective is to establish proper drainage grades around the building foundations, directing water away from the structure. Any unsuitable soil that cannot be incorporated into the new grading plan is collected for off-site removal or designated customer use.
Goal: This step involves using a skid steer to grade the ground around the building for proper drainage and to remove or redistribute excess soil and rock, preparing the site for further cleanup.
Tools and materials
- Dump Trailer
- Skid Steer / Compact Track Loader
What they say
(126 characters)Hide
What they say
(126 characters)Auto-generated from the video audio.