Skip to main content

Construction Equipment Demobilization and Transport

4:48
14:29
68.8K views

At 4:48 in

Last Day: Emergency Foundation repair. First Day: Franky's new site

What happens here

Carefully back the black Dodge Ram 2500 pickup truck to align with the Sure-Trac dump trailer. Engage the trailer jack to connect the trailer to the truck's hitch, ensuring a secure attachment. Drive the skid steer loader (Caterpillar 259D3) onto the trailer using the built-in ramps, exercising caution due to limited visibility. Secure the skid steer with chains and binders, then transport the entire setup from the worksite to the company's equipment yard. Unload the skid steer and park it in its designated spot.

Goal: Load the skid steer onto a trailer, secure it, and transport all heavy construction equipment from the site to the company yard, marking the completion of major construction and clearing the site.

Tools and materials

  • Chains and Binders
  • Dodge Ram 2500 Pickup Truck
  • Skid Steer Loader (Caterpillar 259D3)
  • Sure-Trac Dump Trailer
  • Trailer Jack

What they say

Hide

haul out this time before they load up the truck Sam runs into the cab to make sure it's in neutral and his foots on the brake [Music] the boys chained up and get ready to go to the next site the next project will be using a completely different set of equipment so all of this has to get returned he has to take it slow backing off the trailer it's a tight squeeze and limited visibility and he knows he's only got inches to spare black skid-steer still hasn't been converted from winter to summer and still has its winter tires on the boys have already brought all their equipment out to the next jobsite so all they've got to do now is Park everything and put it away

Auto-generated from the video audio.