Site Demolition and Initial Excavation
At 0:00 in
It was a BAD TIME for this building inspector to show up.
What happens here
Begin by preparing the excavator for operation. This involves disconnecting the hydraulic lines from any attached equipment, such as a tamper, and ensuring the machinery is ready for use. Proceed with the demolition of the old wooden retaining wall using the excavator equipped with a grapple attachment. Carefully remove the existing wooden timbers and other debris, consolidating them for disposal. Perform initial excavation of the area where the new retaining wall will be constructed, clearing the ground of large obstructions and loose soil. During this phase, be mindful of any existing structures or utilities.
Goal: The first step involves removing the old wooden retaining wall and performing initial excavation of the site using heavy machinery. This includes disconnecting hydraulic lines from excavator attachments and using a grapple attachment to efficiently remove debris.
Tools and materials
- Excavator
- Grapple Attachment
- Wrenches
What they say
(160 characters)Hide
What they say
(160 characters)Auto-generated from the video audio.