Gravel Base Installation and Initial Block Laying
At 1:07 in
It was a BAD TIME for this building inspector to show up.
What happens here
After compacting the subgrade, apply a layer of gravel approximately 6 inches deep across the bottom of the trench. Spread the gravel evenly and compact it thoroughly using the vibratory plate compactor. This compacted gravel layer serves as the wall's foundation, distributing the weight evenly and aiding in drainage. Once the base is prepared, begin laying the first course of retaining wall blocks. Carefully place each block, ensuring it is level both front-to-back and side-to-side, and that it is properly aligned with the planned layout. This initial course is crucial for the overall stability and appearance of the wall. For the two-tier design, ensure the placement accommodates the setback required for the upper wall.
Goal: Lay down and compact the gravel base, then begin installing the first course of retaining wall blocks, ensuring they are level and properly aligned for the two-tier wall system.
Tools and materials
- Level
- Rakes
- Rubber Mallet
- Shovels
- Vibratory Plate Compactor
- Gravel
- Retaining Wall Blocks
What they say
(336 characters)Hide
What they say
(336 characters)Auto-generated from the video audio.