Gravel Base Installation and Initial Block Laying

1:07
23:02
737.3K views

At 1:07 in

It was a BAD TIME for this building inspector to show up.

What happens here

After compacting the subgrade, apply a layer of gravel approximately 6 inches deep across the bottom of the trench. Spread the gravel evenly and compact it thoroughly using the vibratory plate compactor. This compacted gravel layer serves as the wall's foundation, distributing the weight evenly and aiding in drainage. Once the base is prepared, begin laying the first course of retaining wall blocks. Carefully place each block, ensuring it is level both front-to-back and side-to-side, and that it is properly aligned with the planned layout. This initial course is crucial for the overall stability and appearance of the wall. For the two-tier design, ensure the placement accommodates the setback required for the upper wall.

Goal: Lay down and compact the gravel base, then begin installing the first course of retaining wall blocks, ensuring they are level and properly aligned for the two-tier wall system.

Tools and materials

  • Level
  • Rakes
  • Rubber Mallet
  • Shovels
  • Vibratory Plate Compactor
  • Gravel
  • Retaining Wall Blocks

What they say

Hide

[Applause] that's good if you can clear the tree up there try it right there see if you can clear the [Applause] tree in the twin cities metropolitan area we're not allowed to store our materials on the street we used to but we've been fined we've been brought into court we've been given tickets and so we know now that we just have to