Final Trench Preparation and Compaction

9:18
23:02
737.3K views

At 9:18 in

It was a BAD TIME for this building inspector to show up.

What happens here

Once the excavation reaches the desired depth for the retaining wall's base (ensuring adequate depth below the frost line, typically 4 feet in Minnesota), begin final preparation of the trench. Use hand tools like shovels to fine-tune the trench bottom, ensuring it is level and free of loose material. The subgrade must be compacted to optimal density to provide a stable foundation for the wall. A walk-behind vibratory plate compactor is used for this task, typically performed in multiple passes until the soil is firm and unyielding. This step is critical to prevent future settling of the retaining wall.

Goal: Prepare the trench for the base layer by ensuring proper depth, leveling, and compacting the subgrade using a vibratory plate compactor to achieve optimal density.

Tools and materials

  • Rakes
  • Shovels
  • Vibratory Plate Compactor

What they say

Hide

forward so we're digging this out for grid we know we're seven feet wide at the top for grid and uh as we're digging this out we're just doing it in in layers [Applause] um and we're also trying to find to make sure there's no frost boatings that we're gonna run into so should be by all rights four feet down from this sun porch here should be the frost footings but we're not finding any which is great for us because we got to oversize our dig for the the wall but as we dig down we got to keep checking just to make sure because you can't undermine the footings