How I bid Snowplowing TO ALWAYS MAKES MONEY
Video by Stanley "Dirt Monkey" Genadek
Stanley "Dirt Monkey" Genadek
What happens here
This video details the operational aspects of a snow removal business, focusing on the mobilization of heavy equipment like skid steers, backhoes, and various snow pushers. The main instructional content revolves around the financial and strategic considerations for snow plowing contractors, specifically distinguishing between subcontractor and prime contractor roles, and explaining various bidding strategies such as hourly, per-event, and monthly/seasonal flat rates. It also emphasizes calculating production rates and managing responsibilities to ensure profitability.
Transcript
(12,004 characters)Hide
Transcript
(12,004 characters)well they finally stayed in the same spot for once the cord works we do have a pretty cool new gps tracker that i found that i can tuck into every piece of equipment and uh you don't even know it's there a little bit of rain huh a little bit so how do snow plow contractors and snow fighters actually get paid well today we're going to be going over that but we've got a very busy day because we're going to start mobilizing out to our snow sites what you see here is just the beginning we're going to be getting all of our pushers out our skid loaders are going to be set up and we're going to try to get some of our larger equipment out there but let's talk about how we get paid as contractors i want to show you guys something you see this sticker right here you know the name doesn't make a difference but what this sticker symbolizes is unity and what that basically means is when i'm on this site it's a 1.6 million square foot site i am a sub contractor but my business works for that contractor so there's another contractor that oversees the entire complex uh this this one complex here is about 1.6 million square feet and my role in maintaining this complex is simply to do the snow removal i don't have to salt i don't have to do the sidewalks i don't have to feel the phone calls for slip and falls i don't have to deal with complaints i don't have to do with anything but the fun stuff and that's getting snow off from a parking lot and some of you guys have asked well how how do i go about pricing out my business well the first thing that you can do is look at becoming a subcontractor and i know you guys are going to be want you're not going to like this option not every it's not going to be for everybody but it will be for those guys that don't want to deal with all of the other managerial nightmares that go along with being a prime contractor i am a prime contractor on quite a few different projects but when it comes to a larger site like this i found that it's much much easier to deal with it as a subcontractor i get to just do the fun part and that's get the snow off from the parking lot and run heavy equipment but i'm giving up by giving up some of that responsibility i'm also giving up a lot of the profits on the job which means i'm a subcontractor i get paid less per hour so the contractor the managerial company that handles all of the aspects of it they're making a cut off from my hourly wage and every piece of equipment you see here you see that skid loader right there that has an hourly rate that loader has an hourly rate each one of my pickup trucks once they get their plows put on them has an hourly rate and then what happens is the managerial company pays me less than what they get paid by the complex so they're making money off from my labor but they're making money for the labor that they're providing and that's the managerial nightmare of right and there's a lot of work that goes along with running these going stan hey good alex how about you how's that how many loads do you think we got to do like one more one more to get all the pushers out all right well we're going to keep working and then we'll discuss next what it's like to be a contractor and how you can bid the three dif there's three different ways that as a contractor you can bid uh bid your jobs so we'll discuss that next but let's get this stuff on now when i say fun part of our work being a subcontractor takes a lot of the responsibility off for me and puts it on to the company that hires me they're depending on me doing all of my work the way that the cop the customer sees fit okay and a lot of times they got to bring me in and lay out all of the details that they've covered with the actual company that hires them brings them in here we go we got our first pusher booger hooker's on [Music] 17 foot pusher he wants to lock everything in with the 17-foot pusher which means all right so now we're gonna sandwich everything in because if you guys are just never watched my channel before we've had a lot of theft problems out at this site we had actually that's how we got that trailer our other one got stolen all the doors off from our loaders got stolen another year but we do have a pretty cool new gps tracker that i found that i can tuck into every piece of equipment and you don't even know it's there i'm not saying i did it we put both legs down i like to put the legs down because otherwise they can leak and go down on their own okay let's see water just looking real quick okay just looking for hydro leaks hydraulic leaks a little bit of rain huh a little bit there you go now hey hey can we flat butt get that because those teeth if it's a warm day those teeth will go in if we leave it like that let's keep it going you guys know what that meant right oh it's trying to get the water out that's the that's the construction contractors hand signal for i'm trying to get the water out trying to get the water out all right you guys i'm gonna take you along for a ride on one of the we got a little special spot for you guys all right here wired up [Music] [Applause] [Music] now as the prime contractor it is true that i will make about anywhere from 20 to 30 percent more per hour per piece of equipment but that also as the prime contractor means that i have the option to hire subcontractors and pay them less per hour now whether you take that route or not what i need you to understand is what the responsibilities you have as the prime contractor and how you can bid that so uh when i am a prime contractor on project will actually be driving by a few of them that i'm actually the prime contractor on i field all of the calls for all of the service if it's a half inch and we get a glaze of ice i'm feeling that call and i'm taking care of that as a subcontractor i don't have to field that call and if it's an ice storm and my contract says that i'm allowed to i'm hired just to do the snow plowing somebody else has to take care of the ice control but i'm also giving up a big portion of my profits when i work that way so now as a prime contractor if you decide you want to have the whole pie and eat it too and you want to take on all of that responsibility you got a number of different ways that you can bid the snow plowing portion of it alone the first way that you can bid it is on an hourly basis not much different than what you do as a subcontractor the second way you can bid it is on a per push basis and if you bid it on a per push basis or per event basis what that basically means is if you get zero to two inches you should have a rate if you get two to four inches or two to five inches you should have another rate a higher rate if you get five to seven inches you can have a third rate if you get above seven to twelve inches you should have a fourth rate so you need to break down how much you're willing to how much how much they will pay you on a per inch per push basis and it's very critical that you don't give them a flat rate per push basis because a two inch event may take you 30 minutes to do a lot and a 12 inch event may take you three hours so you want to stagger your pricing when you do it on a per push basis but now let's also talk about a monthly basis how do you bid it there's a lot of companies out there that don't do hourly they don't do per push but they give a flat rate fee per month and here's how you do it what you've got to find out is how many events do you have in your neck of the woods per season now in minnesota we have anywhere from 15 to 22 plowable events per year and what i would do is i would look at the contract which would be five months or six months you can make it for whatever you want but we typically start them in november and we'll end them at april so november december january february march april so we've got a six month contract now i take how many events i plan on pushing and i'll i'm going to estimate it on the high side at 22 events because i want to cover my own tail and i take those 22 events and then i have to do the calculation of how much i want to make per push per event and so then i divide that by how many times i plan on going out and then i divide that further by how many months of the year so i come up with one giant fee in my own head of how much for the year here's the whole pie do i need just for the snow plowing portion of this project alone and then i divide that by how many months are in my contract and that's the flat rate fee per month that the ma that the company that i'm turning this into will be paying it doesn't matter how much snow we get or how little snow we get this is a very safe way to protect you guys and it's almost it's just a different form of gambling snow plowing is gambling and you have different forms of it when you plow hourly you might not make anything all season long when you plow on a per push basis then you want big snow falls because you want to you want to capture that larger fee that you're willing to charge them and when you plow on a yearly or a monthly basis where it's a flat rate fee whether it's those are not you'd rather sit home eating your snickerdoodles and drinking hot cocoa watching me on youtube than going out plowing because every time you turn that machine on you're losing money and every time it's sitting and you're doing nothing you're gaining money because you get paid no matter what when you do it that way but not everybody's willing to accept a contract like that so you've got to calculate you got to figure how you're going to do it now on ice control you've also got to take that into consideration if you're going to be the prime contractor because ice control is a completely separate animal and the reason i say this is in some areas you may be out doing more ice control than you do snow plowing some people make a lot more money doing uh doing salting and sanding than they ever do with snow plowing and it just depends on if you want to set up your company to handle that aspect of the service or not so now to bid to break down an average bid you have to find out what the production rate is of the piece of equipment you're using now the standard production rate for a pickup plow truck is to clear 28 000 square feet per hour now of course this is going to vary widely depending on the depth of the snow and there's a lot of other variables but i want to start to just get you guys to wrap your heads around how the different bid processes work so that as you go into a bid for the new year and they throw something at you whether it's hourly seasonal monthly or per push you at least have an idea of what those things mean now if you're going to going to if we go a lot deeper on how to calculate how long it takes to clear a lot that's when you need to look up the different production rates and determine which production rate for what vehicle you're using and apply that math toward the lot that you're going to be working on that's how the big commercial contractors land so many contracts as they just use industry standard production rates and those numbers are out there but you've also got to do some of that math and the calculations yourself to make sure that whatever number you're coming up with is a safe and secure number for your business operations now when i do get to meet a lot of you guys in person and face to face i think one of the things that you guys typically say is the bidding and estimating videos tend to help you guys out the most and so and so what i want to do is i want to sprinkle some of these into the video series so that if you guys are looking for that information it will be out there and available to you guys that's all i got for you on this one god bless you guys i hope this video has helped you out let me know if it has in the comments down below and let me know if you do want to see more bidding and estimating that's all we got for you on this one god bless go get me guys we'll catch you on the next one
Auto-generated from the video audio.