Skip to main content

Assemble Drainage System Branches

6:13
22:30
9.4K views

At 6:13 in

Installing Drainage Under The Patio!

What happens here

Once the individual pipe sections are laid out and graded, connect the various branches of the perforated pipe system to the main solid discharge pipe. The video shows using Y-connectors and 90-degree elbows to merge multiple collection lines into a single, continuous flow path. These connections should also be primed and cemented to ensure a secure and watertight fit. Ensure that the main solid pipe, which will carry water away from the foundation, maintains its downward slope towards the final discharge point.

Goal: Connect all collection pipes to the main discharge line for unified water flow.

Tools and materials

  • Perforated PVC Pipe — The collection lines
  • PVC 90-degree Elbows — Changing direction of pipes
  • PVC Cement — Securing all pipe connections
  • PVC Primer — Ensuring strong pipe bonds
  • PVC Y-Connectors — Merging multiple lines into one
  • Solid PVC Pipe — The main discharge line
  • Work Gloves — Protection during cementing

What they say

Hide

there got [Music] it that goes on top of that I don't know what I don't know what what's going on there with that covered this there's a coupling that me

Auto-generated from the video audio.