Add Clean Stone, Fabric, and Compact
At 15:08 in
Installing Drainage Under The Patio!
What happens here
After successfully installing and testing the drainage pipes, cover the geotextile fabric and pipes with a layer of clean stone (gravel). The video shows a dump truck delivering the stone and the mini skid steer spreading it into the trench and surrounding area. Once the initial layer of stone is spread, cover it with another layer of geotextile fabric. This second layer helps prevent the final backfill soil from mixing with the clean stone, maintaining the integrity of the drainage layer. Finally, use a plate compactor to compact the stone layer, creating a stable base for the subsequent pavers or landscaping.
Goal: Create a robust and well-drained base for the patio.
Tools and materials
- Clean Stone — Filling the trench and providing drainage
- Geotextile Drainage Fabric — Separating the stone layer from the soil
- Mini Skid Steer Dingo TX-1000 — Spreading gravel and preparing the base
- Plate Compactor — Compacting the stone layer for stability
- Rake — Leveling the stone before compacting
What they say
(698 characters)Hide
What they say
(698 characters)Auto-generated from the video audio.