Complete Top Row and Address Gas Valve
At 6:11 in
I Turned Old Barn Wood Into a Garage Accent Wall
What happens here
For the final top row, the creator measures the varying gap between the installed barnwood and the ceiling (e.g., 2 1/8 inches and 2 1/2 inches) and then rips the boards to the necessary widths using a table saw. He also needs to cut a circular opening for a gas valve. He marks the board by aligning it and measuring the gas valve's center (4 1/2 inches from the wall). He then uses a drill with a 7/8-inch bit to create the opening. To fit the board, he temporarily removes the gas valve using channel locks. After the board is in place, he applies thread sealant (Loctite) to the valve threads and reattaches it, ensuring a tight seal. He then sprays soapy water on the connection to check for any gas leaks. Finally, the top boards are secured with the nail gun, and a hammer is used to gently tap them into place for a snug fit.
Goal: Install the final row of barnwood, cutting around the gas valve and ensuring its proper reinstallation
Tools and materials
- 7/8-inch Drill Bit — Creating the opening for the gas valve
- Barnwood Planks — The final boards for the top row and around the gas valve
- Channel Locks — Temporarily removing and reattaching the gas valve
- Drill Milwaukee — Drilling the hole for the gas valve
- Hammer Boss Blue Collar Hammer — Tapping boards into a snug fit
- Nail Gun Ridgid — Securing the top boards
- Table Saw — Ripping boards to the custom widths for the top row
- Tape Measure — Measuring the width needed for the top row and gas valve placement
- Soapy Water — Testing for gas leaks
- Thread Sealant Loctite — Ensuring a gas-tight seal on valve threads
What they say
(2,219 characters)Hide
What they say
(2,219 characters)Auto-generated from the video audio.